You need to sign in or sign up before continuing.
Scan barcode
74 pages • missing pub info (editions)
ISBN/UID: 9781496099259
Format: Paperback
Language: English
Publisher: Createspace Independent Publishing Platform
Publication date: 04 March 2014
Description
The October 2007 breaching of a temporary cofferdam constructed during removal of the 15-meter (m)-tall Marmot Dam on the Sandy River, Oregon, triggered a rapid sequence of fluvial responses as 730,000 cubic meters of sand and gravel filling the f...
Community Reviews
Content Warnings
74 pages • missing pub info (editions)
ISBN/UID: 9781496099259
Format: Paperback
Language: English
Publisher: Createspace Independent Publishing Platform
Publication date: 04 March 2014
Description
The October 2007 breaching of a temporary cofferdam constructed during removal of the 15-meter (m)-tall Marmot Dam on the Sandy River, Oregon, triggered a rapid sequence of fluvial responses as 730,000 cubic meters of sand and gravel filling the f...